Short answer: For a custom hunting backpack, sampling takes 7–15 days once the design and camo are confirmed, and bulk production takes 45–65 days after sample approval and deposit. A complete OEM programme from first inquiry to loading runs 10–14 weeks. Repeat orders on an existing pattern typically ship faster, because patterns, tooling and material approvals are already in place.
| Stage | Time | What happens |
|---|---|---|
| 1. Inquiry and quotation | Within 24 hours | Spec review, MOQ, unit price |
| 2. Camo / design | 3–7 days | Pattern drawing, free tech pack, camo or Pantone approval |
| 3. Sampling | 7–15 days | Physical sample produced and shipped for approval |
| 4. Production | 45–65 days | Fabric in, cutting, sewing, inspection, packing |
| 5. Payment | — | T/T 30% deposit + 70% before shipment, or Trade Assurance |
| 6. Shipping | DDP / FOB worldwide | Air, sea or express per your terms |
Work backwards from the season, not forwards from the deposit. If you need packs landed for a September season and sea freight takes 30–40 days, the production slot has to be booked by May. Approve the sample in the first half of that window and you keep the whole season.
That paper trail is what lets a purchase team defend a launch date internally, and what stops a timeline from being quietly renegotiated halfway through an order.
Sample and production schedules are quoted together, in writing, at the quotation stage — the 7–15 day sample window and the 45–65 day bulk window are commitments rather than estimates. A 24-hour reply guarantee means design questions do not sit unanswered while your production slot moves closer.
Capacity is what backs the date. Our Guangzhou plant runs 20 production lines with 350+ staff in a 3,300 ㎡ facility, cutting and sewing 30,000–50,000 backpacks a month — which is why a 300-piece order is a scheduled block rather than a gap-filler, and why orders placed before the pre-season rush keep their original window.
Next step: tell us your target landing date and we will build the schedule backwards from it.
july